List of Common Inspections

These lists are intended to provide an outline of the most common inspections we conduct. This list does not cover every inspection type we are able to conduct. If you are not sure what type of inspection you require or when you will require it, please contact us. All trades must pass the Rough-in inspection before the framing inspection is able to be passed. All trades must pass a final inspection before the Building Final inspection is able to be passed. All-Energy Inspections are conducted by 3rd party inspection companies. You must submit the Energy Code Certification prior to scheduling Final Inspections.

All new structures must be unoccupied at the time of final inspection.

This list includes both Common Residential and Common Commercial Inspections.


  • RESIDENTIAL
  • HVAC Rough-In
  • HVAC Final
  • Electrical T-Pole (Temporary Power Pole)
  • Electrical Rough-In
  • TRP (Temporary Release of Power also known as a TCI inspection.)
  • Electrical Meter Release
  • Electrical Final
  • Plumbing Sewer Line
  • Plumbing Water Line
  • Plumbing Underground Rough-In
  • Gas Line
  • Plumbing Rough-In
  • Gas Rough-In
  • GTO (Gas Turn On also known as a Gas Meter Release)
  • Water Heater (if not a part of a separate Final inspection)
  • Plumbing Final
  • Gas Final
  • Building Driveway
  • Building Sidewalk (typically conducted at the same time as a driveway inspection)
  • Building Foundation
  • Building Clip & Strap (The Nassau Bay Building Department will accept an engineer letter for the clip and strap. This letter will need to be specific with the clips and straps used and the codes of approval.)
  • Building Roof (a separate Final Inspection for Roof permit only)
  • Building Framing
  • Building Brick Tie / Stucco
  • Building Windows (Must have Manufacturer stickers showing code information affixed to the windows for the inspection.)
  • Building Final
  • COMMERCIAL
  • HVAC Duct Seal
  • HVAC Rough-In
  • HVAC Ceiling Cover
  • HVAC Final
  • Electrical T-Pole
  • Electrical Ceiling Cover
  • Electrical Rough-In
  • TRP (Temporary Release of Power aka TCI)
  • Electrical Meter Release
  • Electrical Final
  • Plumbing Sewer Line
  • Plumbing Water Line
  • Plumbing Underground Rough-In
  • Gas Line
  • Plumbing Rough-In
  • Gas Rough-In
  • GTO (Gas Turn On aka Meter Release)
  • Water Heater (if not part of a separate Final Inspection)
  • Plumbing Final 
  • Gas Final
  • Building Driveway 
  • Building Sidewalk
  • Building Foundation
  • Building Clip & Strap (Wood Structures)
  • Building Roof
  • Building Ceiling Cover
  • Building Framing
  • Building Brick Tie / Stucco
  • Building Windows 
  • Building Final (Must have Fire Marshal must approval prior to requesting.)